7 record(s) found for principle investigator "Trimble, Annika" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Northern Native Seed Development Field Trials
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2007 2006
Summary: The objective of this sub-project are: 1) to continue assessing the performance of native plants which were seeded and transplanted into field plots in 2006 and 2007. 2) to establish two new field plots at the Inuvik golf course with the same intent of monitoring native seed performance in a disturbed habitat. The research team intend to collect data regarding winter survival, seedling emerg...


Wind Energy Monitoring at Yellowknife (2015-2017)
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2017 2016 2015
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...


Wind Energy Monitoring at Storm Hills: 2012-2014
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2014 2013 2012
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at Storm Hills for two years, as part of an alternative energy study for the Inuvik area. Wind data will be collected using an existing infrastructure (New North Networks tower) at the site. Two full years of wind measurements and an economic analysis will be necessary to confirm this prediction and the viab...


Wind Energy Monitoring at Inuvik High Point (2013-2015)
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2018 2017 2016 2015 2015 2014 2013
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at the Inuvik high point (approximately 6 km northeast of the Inuvik airport) for two years. This is part of an alternative energy study for the Inuvik area. Wind data will be collected using instruments on a wind tower that will be installed at the site. Two full years of wind measurements and an economic analy...


Solar Irradiance Monitoring in Jean Marie River and Fort Providence
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2014 2013 2012 2011
Summary: To measure solar irradiance levels in Jean Marie River and Ft. Providence, in order to support pre-feasibility studies on the use of solar energy in those communities. The project engineer will travel to Jean Marie River and Fort Providence to start monitoring solar irradiance in the two communities. The monitoring units will likely be placed on a GNWT building in Fort Providence, and on the ba...


Wind Energy Monitoring in Wekweètì: 2010 - 2012
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2012 2011 2010
Summary: The objective of this wind monitoring project is to quantify Wekweètì’s wind energy resources. The Aurora Research Institute recently completed a desktop study concerning wind energy in Wekweètì. Computer modeling and analysis of data from nearby weather stations indicate that the wind speeds in the community may be strong enough to support the use of wind energy in Wekweètì at the proposed projec...


Wind Energy Monitoring at Thor Lake 2009-2010
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2012 2011 2010 2009
Summary: The objective of this wind monitoring proposal is to quantify the wind energy potential to assess the economic feasibility of installing a wind turbine as a part of the Avalon Rare Metals Inc. development near Thor Lake. A mine is expected to be built in the next few years and will employ 100 people. There will be a mine, a mill and a camp and the operation is expected to demand 5 to 10 MW of elec...


TOTAL PAGES: 1