4 record(s) found with the tag "economic feasibility" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Wind Energy Monitoring at Snare Hill
Principal Investigator: Dares, Matthew J
Licenced Year(s): 2018
Summary: The objective of this wind monitoring proposal is to continue to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) until the site is next serviced and the equipment removed. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. Sensors are already in...


Wind Energy Monitoring at Yellowknife (2015-2017)
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2017 2016 2015
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...


2006 Biophysical and Reconnaissance Studies in the Inuvialuit Settlement Region
Principal Investigator: Martin, Sandy D
Licenced Year(s): 2006
Summary: The proposed biophysical and reconnaissance studies are aimed at collecting data to assess the feasibility of constructing a potential oil and gas pipeline for the Mackenzie Gas Project. The 2006 work programme includes: route and site reconnaissance; aquatic and terrestrial studies; and engineering, geological and geophysical studies. Route and site reconnaissance comprise: verification of the ...


Devon Canada Test Ice Pad
Principal Investigator: Millman, Pete
Licenced Year(s): 2002
Summary: The primary objective of this work is to investigate whether a full scale insulated ice pad is economically, structurally, and environmentally feasible in the Mackenzie Delta for the purpose of an exploratory drilling program. The pad will be constructed...


TOTAL PAGES: 1