17 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Land Use and Regulatory Permitting - Trout Lake Airport
Principal Investigator: Koke, Paul E
Licenced Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Trout Lake Airport. As a result, it is required that a L...


Land Use and Regulatory Permitting - Colville Lake Airport
Principal Investigator: Koke, Paul Koke E
Licenced Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Colville Lake Airport. As a result, it is required that a...


Environmental Screening of the Inuvik Airport Runway Extension
Principal Investigator: Thomas, Craig J
Licenced Year(s): 2009
Summary: The objective of the study under this licence is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain and vegetation. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to extend the length of the existing runway at its Inuvik Airport from 6,000 ft. to 9,000 ft. It is curre...


MGM Energy Corp. 2007, 2008 and 2009 Summer Field Assessment and Advance Barge Project (the Project)
Principal Investigator: Maaskant, Shirley
Licenced Year(s): 2009 2007
Summary: This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...


Inventory and assessment of drilling waste sumps in the Mackenzie Delta of the Inuvialuit Settlement Region
Principal Investigator: Quaife, Ron
Licenced Year(s): 2005
Summary: This research will help address growing concerns over the use of sumps as a disposal option for drilling waste in the Inuvialuit Settlement Region and is a first step in evaluating the environmental conditions at historic sump sites. The specific objectives of this research include: 1) conducting an inventory of all known specified drilling sump locations within the ISR (including location, last ...


Inventory and assessment of drilling waste sumps in the Mackenzie Delta of the Inuvialuit Settlement Region
Principal Investigator: Graf, Linda H
Licenced Year(s): 2005
Summary: This research will help address growing concerns over the use of sumps as a disposal option for drilling waste in the Inuvialuit Settlement Region and is a first step in evaluating the environmental conditions at historic sump sites. The specific objectives of this research include: 1) conducting an inventory of all known specified drilling sump locations within the ISR (including location, last k...


Assessment, Remediation and Associated Services for Former Uranium Mines, NWT
Principal Investigator: Wiatzka, Gerd M
Licenced Year(s): 2009 2008 2007 2006 2005
Summary: This research program is a continuation of the environmental assessment of the existing conditions at and near the Port Radium site. Information collected during this study will add to the base of existing information and aid in refining the final decommissioning plan for the site. The work will be done through manual sampling and measurement; no heavy equipment or drills will be used. Sampling...


O-80 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


M-25 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


TOTAL PAGES: 2