Principal Investigator:Marshall, John J Licenced Year(s):
2013
Summary:
The objective of this project at Thetis Bay is to ensure there is no unforeseen debris in the water around the caissons prior to moving. The objective at Tuktoyaktuk is to see if the caissons could be moved close enough to shore to offer a benefit to mitigate shore erosion.
One small bathymetry vessel would be used in the program and one large Northern Transportation Company (NTCL) mainline tu...
Principal Investigator:Cote, Jason E Licenced Year(s):2010
2009
Summary:
The objectives of this project are to:
- Conduct a fish and fish habitat assessment upstream and downstream of the proposed Project Site (2nd rapids on Snowdrift River). This would involve vegetation assessment, depth and velocity transects and fish sampling.
- Conduct fish and fish habitat assessments in the Snowdrift River tributaries at the proposed road crossings between Lutsel K’e communi...
Principal Investigator:Hawkins, Jim R. Licenced Year(s):
2007
Summary:
Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...
Principal Investigator:Povey, Andrew Licenced Year(s):
2005
200420032002 Summary:
From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...
Principal Investigator:Povey, Andrew Licenced Year(s):2004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...
Principal Investigator:Povey, Andrew Licenced Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area.
During the flights, locations of important land features will be confirmed by Global...
Principal Investigator:Povey, Andrew Licenced Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area.
During the flights, locations of important land features will be confirmed by Glo...
Principal Investigator:Povey, Andrew Licenced Year(s):20052004
2003
2002 Summary:
This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region.
During the flights, locations of important land features will be confirmed by...