8 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Tarsiut Caissons - Removal and Remediation Plan
Principal Investigator: Marshall, John J
Licenced Year(s): 2013
Summary: The objective of this project at Thetis Bay is to ensure there is no unforeseen debris in the water around the caissons prior to moving. The objective at Tuktoyaktuk is to see if the caissons could be moved close enough to shore to offer a benefit to mitigate shore erosion. One small bathymetry vessel would be used in the program and one large Northern Transportation Company (NTCL) mainline tu...


Lutsel K'e Mini Hydro Project
Principal Investigator: Cote, Jason E
Licenced Year(s): 2010 2009
Summary: The objectives of this project are to: - Conduct a fish and fish habitat assessment upstream and downstream of the proposed Project Site (2nd rapids on Snowdrift River). This would involve vegetation assessment, depth and velocity transects and fish sampling. - Conduct fish and fish habitat assessments in the Snowdrift River tributaries at the proposed road crossings between Lutsel K’e communi...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - K'asho Got'ine District
Principal Investigator: Hawkins, Jim R.
Licenced Year(s): 2007
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...


2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


TOTAL PAGES: 1