6 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Northwest Territories Power Corporation Twin Gorges Aquatic Effects Monitoring Plan and Sediment and Erosion Management Plan
Principal Investigator: Byrne, Geraldine
Licenced Year(s): 2013
Summary: The Aquatic Effects Monitoring Plan (AEMP) and Sediment and Erosion Management Plan (SEMP) are requirements under water license MV2011L0002 issued by the Mackenzie Valley Land and Water Board (MVLWB). The objective of the AEMP is to monitor and identify potential short-term, long-term and cumulative changes throughout the Taltson River aquatic environment. The objective of the SEMP is to identify...


2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


Coastal Sedimentary Processes and Geotechnical Conditions, North Head Area, Richards Island, Canadian Beaufort Sea
Principal Investigator: Forbes, Donald L
Licenced Year(s): 1991 1990
Summary: The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....


Precise Geodetic Levelling
Principal Investigator: Erickson, Dave
Licenced Year(s): 1991
Summary: The Researcher and his team will carry out a project to improve water flow studies, channel dredging, mapping and local construction surveys....


Licence #2449
Principal Investigator: Sherstone, David A.
Licenced Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....


Licence #2284
Principal Investigator: Grey, Bryan J.
Licenced Year(s): 1978
Summary: 1. To obtain relative sediment loadings in the Liard River and the Mackenzie River above and below its junction with the Liard. 2. To measure spring and summer flow patterns in the Liard River at several sites along the propsoed Liard higway....


TOTAL PAGES: 1