8 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Investigating the relationship between snow microstructure and airborne synthetic aperature radar measurements of tundra snow to improve environmental prediction capabilities in polar regions
Principal Investigator: Derksen, Chris
Licenced Year(s): 2018
Summary: New high resolution Ku- and Ka-band synthetic aperture radar (SAR) measurements are being proposed to measure tundra snow water equivalent (SWE) from future space-borne sensors, however further work is necessary to test the mission concept using airborne instruments that replicate the proposed satellite sensors. During the winter of 2012-2013 a research campaign at the Trail Valley Creek study sit...


Comparing the snow depths and densities of different habitats in the Beaufort Delta region
Principal Investigator: Kasook, Davonna C
Licenced Year(s): 2017
Summary: The objective is to compare differences in snow depth, density and morphology of a heavily forested site and a tundra site. The Principal Investigator (PI) will study the effect landscape (forest vs. tundra) has on seasonal snow pack evolution and physical properties (density, temperature, snow grain morphology, and stratigraphy) of the snowpack. These results will be compared to historical data (...


Northwest Territories Power Corporation Twin Gorges Aquatic Effects Monitoring Plan and Sediment and Erosion Management Plan
Principal Investigator: Byrne, Geraldine
Licenced Year(s): 2013
Summary: The Aquatic Effects Monitoring Plan (AEMP) and Sediment and Erosion Management Plan (SEMP) are requirements under water license MV2011L0002 issued by the Mackenzie Valley Land and Water Board (MVLWB). The objective of the AEMP is to monitor and identify potential short-term, long-term and cumulative changes throughout the Taltson River aquatic environment. The objective of the SEMP is to identify...


2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


Coastal Sedimentary Processes and Geotechnical Conditions, North Head Area, Richards Island, Canadian Beaufort Sea
Principal Investigator: Forbes, Donald L
Licenced Year(s): 1991 1990
Summary: The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....


Precise Geodetic Levelling
Principal Investigator: Erickson, Dave
Licenced Year(s): 1991
Summary: The Researcher and his team will carry out a project to improve water flow studies, channel dredging, mapping and local construction surveys....


Licence #2449
Principal Investigator: Sherstone, David A.
Licenced Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....


Licence #2284
Principal Investigator: Grey, Bryan J.
Licenced Year(s): 1978
Summary: 1. To obtain relative sediment loadings in the Liard River and the Mackenzie River above and below its junction with the Liard. 2. To measure spring and summer flow patterns in the Liard River at several sites along the propsoed Liard higway....


TOTAL PAGES: 1