8 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Land Use and Regulatory Permitting - Trout Lake Airport
Principal Investigator: Koke, Paul E
Licenced Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Trout Lake Airport. As a result, it is required that a L...


Land Use and Regulatory Permitting - Colville Lake Airport
Principal Investigator: Koke, Paul Koke E
Licenced Year(s): 2009
Summary: The objective of this study is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain, vegetation, and proximity and access to the community. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to relocate and expand the Colville Lake Airport. As a result, it is required that a...


Environmental Screening of the Inuvik Airport Runway Extension
Principal Investigator: Thomas, Craig J
Licenced Year(s): 2009
Summary: The objective of the study under this licence is to determine a general inventory of the physical features of the proposed project site, focusing primarily on the terrain and vegetation. The Government of the Northwest Territories, Department of Transportation, Airports Division is looking to extend the length of the existing runway at its Inuvik Airport from 6,000 ft. to 9,000 ft. It is curre...


MGM Energy Corp. 2007, 2008 and 2009 Summer Field Assessment and Advance Barge Project (the Project)
Principal Investigator: Maaskant, Shirley
Licenced Year(s): 2009 2007
Summary: This study is a field assessment which consists of targeted visits to selected sites, identified within the delineated barge landing sites and drilling target areas. Overland access routes will be visited, though these corridors have not been determined at this time. Information collected during the summer studies will be used in planning and determining appropriate locations for winter drilling a...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Route and Site Selection in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Sahtu Settlement Area. During the flights, locations of important land features will be confirmed by Global...


2003 Route and Site Selection in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Gwich'in Settlement Area. During the flights, locations of important land features will be confirmed by Glo...


2003 Route and Site Selection in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Inuvialuit Settlement Region. During the flights, locations of important land features will be confirmed by...


TOTAL PAGES: 1