6 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - K'asho Got'ine District
Principal Investigator: Hawkins, Jim R.
Licenced Year(s): 2007
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope and the C.N.T. Trail, north of Fort Good Hope. A temporary rig camp will be established near the Town of Fort Good Hope. The camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existing cutlines, rights-of-way, and trails w...


2007 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Hawkins, Jim R.
Licenced Year(s): 2006 2006
Summary: Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of the existing winter road and Little Smith Creek. Each camp will be able to accommodate up to 60 people. Secondary access to the investigation sites and potential water sources will follow existi...


2005 Terrestrial Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: The 2005 terrestrial studies in the Inuvialuit Settlement Region (ISR) will include vegetation classification, rare plant surveys, and landform, soil and permafrost investigations. The studies will be conducted by three- or four-person crews supported by helicopter and based in Inuvik. A local assistant will be hired as part of each survey team. Air calls from a helicopter will be used to map ...


M-25 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


Reconnaissance of the East Channel of the Mackenzie Delta
Principal Investigator: Brooks, Greg
Licenced Year(s): 1993
Summary: If an oil and gas pipeline is constructed that extends from the Mackenzie Delta to the south, the pipeline will likely cross the East Channel at either Lousy or Swimming Points. Both of these sites have been studied in the past, but little detailed information has been collected on the physical features of these sites. Data will be collected on the features of these sites, including a survey of ...


Licence #2449
Principal Investigator: Sherstone, David A.
Licenced Year(s): 1979
Summary: To conduct aerial photography to identify possible ice jam areas. To conduct aerial photography to identify alternate pipeline routes. To collect samples of river water for sediment load analysis....


TOTAL PAGES: 1