83 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

2005 Summer and Fall Aquatic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: From 2001 to 2004, aquatics studies were done in the Niglintgak, Taglu and Parsons Lake lease areas and along the proposed gathering pipeline. In addition, aquatic studies at proposed infrastructure sites and borrow pits were initiated in 2004. The 2005 studies are a continuation of the work done in previous years. The work will include additional investigations into fish and fish habitat, hydrolo...


2005 Route and Site Reconnaissance in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential gas gathering system and potential pipeline route through the Inuvialuit Settlement Region; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites, water withdrawal sites, and potential revegetation test sites; visually inspect and confirm land for...


2005 Route and Site Reconnaissance in the Gwich’in Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: The route and site reconnaissance activities will be used to: review the proposed location for a potential pipeline route through the Gwich’in Settlement Area (GSA); revisit or determine the optimal locations for proposed gas compression facilities near Inuvik; revisit or determine the optimal locations for infrastructure sites, roads, granular resource sites and potential revegetation test sites;...


O-80 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


M-25 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


O-35 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


F-36 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


2005 Winter Field Geotechnical Investigation Program in the Sahtu Settlement Area - Tulita District
Principal Investigator: Graburn, Larry
Licenced Year(s): 2005
Summary: A field office will be set up in Norman Wells. Primary access to the field is the winter road that extends north of Wrigley to Fort Good Hope. Two temporary rig camps will be set up, one near the Hamlet of Tulita and the other near the intersection of...


2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licenced Year(s): 2005 2004
Summary: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


TOTAL PAGES: 9