84 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

2005 Winter Field Geotechnical Investigation Program in the Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licenced Year(s): 2005 2004
Summary: Field investigation activities will be directed and carried out from existing accommodation in Inuvik. The work area will be accessed from the Dempster Highway and the C.N.T. trail. Secondary access will follow existing winter roads, rights-of-way, and...


2005 Winter Field Geotechnical Investigation Program in the Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licenced Year(s): 2005
Summary: This program will investigate five potential sources of granular materials and subsurface drilling at the proposed Storm Hills Pigging Facility. It is estimated that the program will require up to 90 days to complete. Up to 45 persons are expected to wor...


2003 Field Reconnaissance - Deh Cho Region
Principal Investigator: Graburn, Larry
Licenced Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Field Reconnaissance - Sahtu Settlement Area
Principal Investigator: Graburn, Larry
Licenced Year(s): 2004 2003
Summary: The objective of this field reconnaissance program is to conduct preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential cam...


2003 Route and Site Selection in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2004 2003 2002
Summary: This project will involve several helicopter flights for the purposes of pipeline routing, site selection and geotechnical observation within the Deh Cho Region. During the flights, locations of important land features will be confirmed by Global Positi...


2003 Field Reconnaissance - Inuvialuit Settlement Region
Principal Investigator: Graburn, Larry
Licenced Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, anchor field pads (Niglintgak, Taglu, Parson's Lake), watercourse crossings, water sources for ice roa...


2003 Field Reconnaissance - Gwich'in Settlement Area
Principal Investigator: Graburn, Larry
Licenced Year(s): 2004 2003
Summary: This field reconnaissance program involves preliminary site investigations of potential barge sites, camp sites, stockpile sites, compressor locations, watercourse crossings, water sources for ice road construction and potential campsites, borrow sources...


Winter Low Ground Pressure Vehicle Trials
Principal Investigator: Callow, Lin
Licenced Year(s): 2004
Summary: The objective of these trials is to evaluate the performance of Low Ground Pressure Vehicles (LGPV) on frozen tundra without surface preparation. The effects of LGPV passage on soil, permafrost, and vegetation will be monitored and the details of each tr...


Devon Canada Test Ice Pad
Principal Investigator: Millman, Pete
Licenced Year(s): 2002
Summary: The primary objective of this work is to investigate whether a full scale insulated ice pad is economically, structurally, and environmentally feasible in the Mackenzie Delta for the purpose of an exploratory drilling program. The pad will be constructed...


Mallik 2002 Gas Hydrate Production Research Project
Principal Investigator: Dallimore, Scott R
Licenced Year(s): 2008 2007 2002 1998
Summary: Field activities for this project will be covered under various permits being applied for the engineering operations. The Mallik site will be accessed by ice roads from Inuvik. The Mallik wells will be drilled by the Akita 15 rig (local northern company). We expect up to 60 scientists (and 40 operations staff) to be on site at the height of the program. Scientists will be housed in facilities of ...


TOTAL PAGES: 9