84 record(s) found with the tag "engineering" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Reconnaissance of the East Channel of the Mackenzie Delta
Principal Investigator: Brooks, Greg
Licenced Year(s): 1993
Summary: If an oil and gas pipeline is constructed that extends from the Mackenzie Delta to the south, the pipeline will likely cross the East Channel at either Lousy or Swimming Points. Both of these sites have been studied in the past, but little detailed information has been collected on the physical features of these sites. Data will be collected on the features of these sites, including a survey of ...


Iqaluit Sewer Collapse Problems
Principal Investigator: Hanna, Alan
Licenced Year(s): 1992 1991 1990
Summary: Instruments will be installed along suspected problem areas during construction, and monitoring will take place to make recommendations for future material selection and construction designs....


Architecture and Construction Technique in the North
Principal Investigator: Nadji, Kayhan
Licenced Year(s): 1992 1991
Summary: The Researcher will continue to investigate the relationship between the architectural and technical aspects of buildings and severe northern climate....


Urban Planning and Life Between the Houses
Principal Investigator: Bisgaard, Inngi
Licenced Year(s): 1991
Summary: The Researcher will continue to study urban planning in arctic areas. This field season investigation will include how people use outdoor spaces in relation to weather, destinations and playgrounds....


Coastal Sedimentary Processes and Geotechnical Conditions, North Head Area, Richards Island, Canadian Beaufort Sea
Principal Investigator: Forbes, Donald L
Licenced Year(s): 1991 1990
Summary: The Researchers will use the ARKTOS 5 amphibious vehicle for geophysical surveying in the vicinity of Tuktoyaktuk and the proposed Amauligak pipeline landing site on Richards Island. They will measure nearshore sediment dynamics using wave and current meters at selected locations in the vicinity of the proposed pipeline landing site at North Head....


Development of a Backup Communications System
Principal Investigator: Strickland, John I.
Licenced Year(s): 1991 1990
Summary: The Research Team will install digital radio repeaters at several sites, monitor the signal strength; measure the accuracy of data transmission over the link and establish the feasibility of the prototype design....


Precise Geodetic Levelling
Principal Investigator: Erickson, Dave
Licenced Year(s): 1991
Summary: The Researcher and his team will carry out a project to improve water flow studies, channel dredging, mapping and local construction surveys....


Spray Ice-Rubble Research Project
Principal Investigator: Weaver, Jeff
Licenced Year(s): 1991
Summary: The research team will spray a small area of grounded rubble with sea water and measure the sliding resistance of the rubble. They will measure ice loads on the rubble, the horizontal movement of the landfast ice sheet and the rubble field....


Arctic Building Design and Urban Planning
Principal Investigator: Gisgaard, Inngi
Licenced Year(s): 1990
Summary: The Researcher will interview individual architects, engineers, and government department employees concerning housing design and construction in the eastern and western arctic....


Horticultural Crop Production in Northern Canada: Fiberoptic Collection and Transmission System for the Purpose of Food Production
Principal Investigator: Hachey, Gene O.E.
Licenced Year(s): 1989
Summary: Mr. Gene Hachey and his team will be examining a new method for producing horticultural crops on a year round basis in areas North of 60. The project will build a prototype light collection and transmission device and will evaluate the potential for irradiating horticultural crops grown in an opaque, insulated structure such as a green house....


TOTAL PAGES: 9