6 record(s) found with the tag "landscape disturbance" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

The cumulative impacts of rapid environmental change in the northwestern NWT: Investigating the impacts of mega-slump disturbances on terrestrial and aquatic ecosystems in the lower Peel watershed, NW
Principal Investigator: Lacelle, Denis
Licenced Year(s): 2013 2012
Summary: This is a multidisciplinary project involving communities, governments and academic researchers. The goals are to : 1) inventory and track broad scale changes in landscape disturbances; 2) determine the impacts of natural and anthropogenic disturbances on the physical and chemical characteristics and ecology of streams and rivers; 3) determine disturbance thresholds relevant to the health of strea...


Understanding the Need for Novel Forms of Environmental Governance
Principal Investigator: Galbraith, Lindsay
Licenced Year(s): 2004
Summary: This research is concerned with increasingly fractious relations between mining firms and local communities in Canada's hinterlands, and the systems of governance that aim to mediate these relations. More specifically, this research seeks to understand t...


Modified Phase II Environmental Site Assessment O-35 Wellsite
Principal Investigator: Miller, Samantha
Licenced Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the O-35 wellsite. In August 2002, an Environmental Site Assessment was conducted....


Modified Phase II Environmental Site Assessment N-01 Wellsite
Principal Investigator: Miller, Samantha
Licenced Year(s): 2003
Summary: The objectives of this assessment are to conduct a site investigation to evaluate potential environmental impact associated with daily facility operations associated with the N-01 wellsite and to set up background concentrations of parameters for the lea...


Modified Phase II-III Environmental Site Assessment F-36 Wellsite
Principal Investigator: Miller, Samantha
Licenced Year(s): 2003 2002
Summary: The objectives of this assessment are to conduct a soil investigation and remediation associated with the flare stack at the Paramount Resources Ltd. F-36 Wellsite. In August 2002, a modified Phase II Environmental Site Assessment was conducted. The bas...


Studies of the Environmental Effects of Disturbances in the Subarctic (SEEDS)
Principal Investigator: Kershaw, G. Peter
Licenced Year(s): 2000 1999 1998 1997 1996 1995 1994 1993 1992 1990
Summary: Access to the site will be along existing seismic lines from Tulita. Transport will involve helicopter, boat, ATV and foot. The research is planned to see what happens after the fire to the permafrost, soils, plants and animals. An unburned site will be monitored to provide comparison with the burned area. Many studies will be done, including measurements of air and soil temperatures, wind spe...


TOTAL PAGES: 1