3 record(s) found with the tag "road construction" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Fish Habitat Compensation Monitoring Program - Highway #3, Stagg River
Principal Investigator: Moore, Peter
Licenced Year(s): 2001 2000
Summary: This program is a detailed assessment of the created/enhanced habitat at Frank Channel, based on fish use and function in comparison with habitat design targets. Habitat monitoring will require seasonal assessments within the open water period at times associated with the targeted fish's life stages (Northern Pike). During early spring, mid summer and late summer, Frank Channel habitat will be m...


Highway #3 Reconstruction, Preferred Alignment Fisheries Habitat Assessments
Principal Investigator: Thomas, Craig J
Licenced Year(s): 1998
Summary: This study is to identify existing habitat characteristics of the potential and existing stream and pond crossings of the Highway #3 reconstruction project. Field studies will involve the identification of fish habitat characteristics, the potential identification of present fish species in those systems that suggest fish habitat is present by using seine netting techniques. Background data search...


Licence #2343
Principal Investigator: Bouckhout, Leo W.
Licenced Year(s): 1978
Summary: (1) To survey native grasses, legumes and shrubs and evaluate their usefulness for revegetating disturbed areas. (2) To conduct fish counts, collect water samples for chemical data determination and prepare descriptions of all water crossings....


TOTAL PAGES: 1