78 record(s) found with the tag "socio-economics" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

2004 Traditional Knowledge and Socio-Economic Studies in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Inuvialuit Settlement Region (ISR), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary foc...


2004 Traditional Knowledge and Socio-Economic Studies in the Gwich'in Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2005 2004 2003 2002
Summary: This project is a continuation of socio-economic and traditional knowledge (TK) studies in the Gwich'in Settlement Area (GSA), which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus o...


Indigenous Knowledge and Environmental Impact Assessment in the Northwest Territories
Principal Investigator: Christensen, Julia B
Licenced Year(s): 2004
Summary: This graduate research focuses on the application of Traditional Knowledge in environmental impact assessment in the NWT, with a specific focus on the Mackenzie Valley, and will identify the ways in which this application is linked to political, social,...


Taltson Hydro Project; Expansion Baseline Studies and Water Effects Monitoring Program
Principal Investigator: Uren, Shane
Licenced Year(s): 2004
Summary: The Expansion Project proposes to supply power to the Snap Lake, Gahcho Kue, Diavik and EKATI mine sites by expanding the existing infrastructure at the facilities on the Taltson River at Twin Gorges and at Nonacho Lake. Studies characterizing baseline e...


Learning from the Swedes: Community Perspectives on Literacy
Principal Investigator: Ward, Angela
Licenced Year(s): 2004
Summary: The purpose of this study is to determine the policy and practice factors that account for the differences in adult literacy levels between Canada and Sweden. Literacy advocates are anxious to understand why Swedish adults have demonstrated literacy leve...


Bridging the Gap Between Project Assessments and Regional Development Dynamics in the Canadian Arctic
Principal Investigator: Dowlatabadi, Hadi
Licenced Year(s): 2004
Summary: The overall objective of this project is to provide a set of tools to estimate the cumulative impacts of a development project based on its power as an "attractor" to subsequent development. The researchers will make a short visit to Yellowknife to talk...


2003 Traditional Knowledge and Socio-Economic Studies in the Deh Cho Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2003 2002
Summary: This project is a continuation of socio-economic and traditional knowledge studies in the Deh Cho Region, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-economic...


2003 Traditional Knowledge and Socio-Economic Studies in the Sahtu Settlement Area
Principal Investigator: Povey, Andrew
Licenced Year(s): 2003 2002
Summary: This project is a continuation of socio-economic and traditional knowledge studies in the Sahtu Settlement Area, which were initiated in 2002 as part of the baseline studies and assessment for the Mackenzie Gas Project. The primary focus of the socio-ec...


Environmental Studies for Anadarko Canada Energy Ltd.'s Proposed East Liard Gas Gathering System
Principal Investigator: Buckland, Laurie L
Licenced Year(s): 2003
Summary: The field studies are required to obtain specific environmental information for the study area and will be used in the preparation of baseline and environmental impact assessment reports in support of regulatory approvals. The study area is a 5 km wide...


2003 Winter Baseline Noise Monitoring Study in the Inuvialuit Settlement Region
Principal Investigator: Povey, Andrew
Licenced Year(s): 2003 2002
Summary: Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...


TOTAL PAGES: 8