17 record(s) found with the tag "surface water" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Phase I/II/III ESAs and Risk Assessment
Principal Investigator: Hamilton, Melissa M
Licenced Year(s): 2013
Summary: The purpose of each Phase I/II Environmental Site Assessment (ESA) is to determine the current environmental and physical conditions at each site to allow for the potential future development of the appropriate remediation or risk management strategies and costs. This will include the identification and quantification of environmental impacts to all media including soil, sediment, surface water a...


Bosworth Creek Surface Water Monitoring Program
Principal Investigator: Bartlett, Mike
Licenced Year(s): 2012
Summary: The objective of the research project is to monitor the surface water quality in Bosworth Creek. Data from sampling stations established within and downstream of the Site will be compared to upstream reference stations, located beyond the possible influence of the development, and against an appropriate range of regional data indicating natural variability (where available). Stations will be monit...


2009 Baseline Studies for Avalon Ventures Ltd. Proposed Thor Lake Rare Earth Metals Project - Surface Water Hydrology
Principal Investigator: Lennie-Misgeld, Peter
Licenced Year(s): 2011 2010 2009
Summary: This licence is being issued for the scientific research application no. 982. The objective of this research is to characterize the surface water hydrology at the Thor Lake site and vicinity for at least one hydrologic year. The baseline study is being conducted to aid Avalon Ventures in assessing potential environmental effects of its activities and having adequate environmental information to...


O-80 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


K-29 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the community, will access the site and assess the site conditions. The field will be accessed from Fort Liard via the barge. The individual sites will be accessed via truck. At the site, researchers will complete a walk around of the site including the site facilities and surrounding area. Should any soil or s...


O-35 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


F-36 Environmental Site Assessment 2005
Principal Investigator: Kustan, Ed
Licenced Year(s): 2005
Summary: The research team, including an environmental consultant, a technician, and a member of the local community, will access the site and assess the site conditions. The researchers will access the site via helicopter and will complete a walk around of the site including the site facilities and surrounding area. Should any soil or surface water be identified as a concern, a sample will be obtained and...


Baseline Data Collection, Yellowknife Gold Project, Tyhee Development Corp.
Principal Investigator: Weagle, Ken V
Licenced Year(s): 2005 2004
Summary: The purpose of this fieldwork is for the collection of baseline data to support an anticipated application to the Mackenzie Valley Land and Water Board. There are 5 main components of the program. 1) Air quality and climate; General air quality will be m...


Phase II and III Environmental Site Assessment, Pointed Mountain Gas Plant and Associated Facilities
Principal Investigator: Miller, Samantha
Licenced Year(s): 2006 2005 2004 2003 2002
Summary: The Pointed Mountain Gas Plant, four associated wellsites, and some associated infrastructure are being decommissioned. The site was originally constructed in 1966 and has been shut down since September 2001. Previous environmental work and public consul...


Snow Accumulation/Runoff in High Latitude Permafrost Basins
Principal Investigator: Marsh, Philip
Licenced Year(s): 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1990
Summary: The primary objective of this project is to develop improved understanding of the fluxes of water and energy in northern regions, and to develop improved computer models of these processes. The Trail Valley Creek site will be accessed by helicopter and s...


TOTAL PAGES: 2