4 record(s) found with the tag "wind energy" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

GNWT High Point Wind Project - geotechnical investigations
Principal Investigator: Sullivan, Grant
Licenced Year(s): 2018
Summary: Geotechnical investigations are proposed to identify the depth of bedrock and other materials underlying the permafrost onsite. The results of the geotechnical investigations will be used to determine the access route, the project location, and the turbine installation technique. This activity will include drilling of boreholes and collection of samples for testing. Thirteen boreholes are plann...


Wind Energy Monitoring at Yellowknife (2015-2017)
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2017 2016 2015
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at CN Hill (approximately 130 km from Yellowknife) for two years. This is part of an alternative energy study for the Yellowknife area. Wind data will be collected using instruments that measure wind speed, direction, and temperature. At CN Hill, the sensors will be installed on an existing Northwestel Tower. Tw...


Wind Energy Monitoring at Inuvik High Point (2015-2017)
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2017 2016 2015 2015 2014 2013
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at the Inuvik High Point (approximately 6 km northeast of the Inuvik airport) for two years. This is part of an alternative energy study for the Inuvik area. Wind data will be collected using instruments on a wind tower that will be installed at the site. Two full years of wind measurements and an economic analy...


Wind Energy Monitoring in Norman Wells
Principal Investigator: Seccombe-Hett, Pippa
Licenced Year(s): 2010 2009 2008 2007
Summary: The objective of this proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells. This project will involve a site inspection, installation of wind tower and wind monitoring equipment (a 50m tower with 6 calibrated anemometers positioned at 10m, 20m, 30m, 40m and two at 50m level, a wind vane and temperature sensors), and data collecti...


TOTAL PAGES: 1