6 record(s) found with the tag "wind monitoring" (multi-year projects are grouped):
Not seeing the results you want? Try advanced search.

Wind Energy Monitoring at Inuvik High Point (2013-2015)
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2016 2015 2015 2014 2013
Summary: The objective of this wind monitoring proposal is to measure the wind energy potential at the Inuvik high point (approximately 6 km northeast of the Inuvik airport) for two years. This is part of an alternative energy study for the Inuvik area. Wind data will be collected using instruments on a wind tower that will be installed at the site. Two full years of wind measurements and an economic analy...


Wind Energy Monitoring at Thor Lake 2010-2011
Principal Investigator: Trimble, Annika EV
Licenced Year(s): 2012 2011 2010 2009
Summary: The objective of this wind monitoring proposal is to continue quantifying the wind energy potential for the economic feasibility of installing a wind turbine as a part of the Avalon Rare Metals Inc. development near Thor Lake. Also, to carry out a second year of wind data collection to confirm early predictions on the viability of wind energy for the Thor Lake mine site. The project engineer h...


Wind Energy Monitoring in Tuktoyaktuk NWT
Principal Investigator: Seccombe-Hett, Pippa
Licenced Year(s): 2008 2007
Summary: The objective of this wind monitoring proposal is to quantify wind energy potential for the economic feasibility of building a wind farm in Tuktoyaktuk. This year the proposed project will involve maintaining data collection at the wind monitoring site, as well as data analysis and reporting. The Tuktoyaktuk wind monitor will visit the wind tower site monthly and maintain the monitoring site e...


Wind Energy Monitoring in Norman Wells
Principal Investigator: Seccombe-Hett, Pippa
Licenced Year(s): 2010 2009 2008 2007
Summary: The objective of this proposal is to quantify the wind energy potential for the economic feasibility of building a wind farm in Norman Wells. This project will involve a site inspection, installation of wind tower and wind monitoring equipment (a 50m tower with 6 calibrated anemometers positioned at 10m, 20m, 30m, 40m and two at 50m level, a wind vane and temperature sensors), and data collecti...


Testing the WCM Surface Wind Prediction Model at High Latitudes
Principal Investigator: Pickford, Stewart G.
Licenced Year(s): 1988
Summary: Dr. Pickford has developed a computer model that predicts how forest fires will spread in relation to the weather conditions. However, this model was developed for use in southern Canada where wind conditions are different. He wants to collect weather information from the central Mackenzie Valley area so that he can evaluate whether his model is useful in the north....


Licence #4031
Principal Investigator: Neuman, Cheryl McKenna
Licenced Year(s): 1984
Summary: (1) To survey, map and photograph aeolian (wind blown) sediments and landforms within an area extending from the head of the fiord to Tumbling Glacier lake with possible excursions as far as Windy Lake. (2) To install instrumentation that will monitor wind activity, surface and climatic conditions, and sediment movement by wind....


TOTAL PAGES: 1