Principal Investigator:Bekhuys, Tim Licensed Year(s):
2006
2005 Summary:
Baseline studies in the Gahcho Kue (Kennady Lake) area, in conjunction with the DeBeers Gahcho Kue Diamond Mine Project, have been ongoing since 1998. AMEC Earth and Environmental has been contracted by DeBeers to conduct these studies. This year, independent of the Mackenzie Valley Environmental Impact Review Board's regulatory requirements*, two studies are planned to be conducted in the project...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure and granular resources in the Deh Cho Region where there is the potential for noise affecting people and wildlife during the construction and operations of th...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at select potential locations for facilities, infrastructure, access roads and granular resources in the Sahtu Settlement Area where there is the potential for noise affecting people and wildlife during the construction...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted at the proposed location of potential facilities near Inuvik as well as at select potential locations for infrastructure, access roads and granular resources in the Gwich'in Settlement Area where there is the potential...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted within the Niglintgak, Taglu and Parsons Lake Leases as well as at select potential locations for facilities, infrastructure, access roads and granular resources in the Inuvialuit Settlement Region where there is the po...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at a potential facility location near Fort Good Hope and near the Blackwater River. These data will provide estimates of current background ambient noise in the project area, prior to construction of the Mackenzie Gas P...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
Summary:
Noise monitoring will be conducted at two potential sites for a compressor station near Travaillant Lake. These data will provide estimates of background ambient noise, which is needed before construction of the Mackenzie Gas Project. The proposed monit...
Principal Investigator:Povey, Andrew Licensed Year(s):
2003
2002 Summary:
Noise monitoring will be conducted in the Taglu lease and in the Swimming Point, Parsons Lake and Jimmy Lake regions. These data will provide estimates of background ambient noise which will be needed before construction of the Mackenzie Gas Project. Pr...
Principal Investigator:Evans, Kevin Licensed Year(s):
2002
Summary:
The issues to be addressed in the emissions and air impact assessment portion of the project include: 1) adequacy of baseline emissions, air quality, meteorological and climatological data, as well as air quality and deposition monitoring data, for the B...
Principal Investigator:Cosens, Susan Licensed Year(s):
1993
1992 Summary:
In this final year of the study, the researcher will be testing the responses of beluga whales to previously recorded underwater (background) and boat noise. The whales' behaviour to the recorded noises will be measured as a way to determine if belugas alter their behaviour to boat traffic....